Quick Answer: What Is The Lowest Level Of A WBS?

What is the least level of WBS?

work packageThe lowest level of the WBS is called a work package.

It is a discrete deliverable..

What is a WBS chart?

“A work breakdown structure defines all the things a project needs to accomplish, organized into multiple levels, and displayed graphically.” Essentially, the WBS defines the “what” of the project. Everything you need to accomplish in the project is displayed in a single, easy to understand chart.

What is the drawback with traditional WBS?

However, some believe WBS has disadvantages. Project managers must determine the precise amount of detail to be included in the WBS. Too little and the project lacks definition. Too much and the project becomes too bureaucratic. There’s no set way to determine the amount of information in the WBS.

What is the benefit of WBS?

The benefits of creating a WBS include: it defines and organizes the work required. it facilitates the quick development of a schedule by allocating effort estimates to specific sections of the WBS. it can be used to identify potential scope risks if it has a branch that is not well defined.

What is a cost breakdown structure?

A Cost Breakdown Structure (CBS) is a breakdown or hierarchical representation of the various costs in a project. The Cost Breakdown Structure represents the costs of the components in the Work Breakdown Structure (WBS).

What are the different types of WBS?

So the two types of WBS are,Deliverables Oriented. You may come across several other names for this like – Entity Oriented, Noun Oriented or Product Oriented WBS. … Phase Oriented. The other names for this that you might come across are – Activity or Task Oriented, Verb Oriented or Process Oriented WBS.

What does a WBS dictionary look like?

A document that provides detailed information about deliverables, activity and scheduling of each component in the Work Breakdown Structure (WBS). The WBS Dictionary describes each component of the WBS with milestones, deliverables, activities, scope, and sometimes dates, resources, costs, quality.

What are the levels of a WBS?

It shows all the work that needs to be accomplished. The WBS contains 100% of all the work in the project. At the top level is the project ultimate goal, the second level contains the project objectives, the third level has the project outputs and the fourth level with activities.

What is a WBS code?

In a nutshell, work breakdown structure (WBS) codes are outline numbers that you can apply to tasks and edit to match the specific needs of your business. Project automatically provides basic outline numbers for each task, but you can apply your own customized outline scheme to the project at any time.

What are the pros and cons of having many levels of WBS?

The main advantage of the WBS method is that each team member clearly sees how his work affects the success of the project. And just as the whole project depends on the work of each team member. The disadvantages of the WBS method include lack of accuracy.

What is WBS example?

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract.

What should a WBS include?

A reliable, useful work breakdown structure or dictionary should gather the critical elements of a project, along with its timeline, cost, and resources. The most helpful WBS plans contain these components: Identification of which organization, department, or individual is responsible for each specific work piece.